Code WBS


<< Prev   Next >>

A code used to uniquely identify each phase of the work breakdown structure (WBS). The code indicates the project phase position in the work breakdown structure of a project. For example, for "1.1 subphase", Code WBS is 1.1. It indicates that this is a phase of the second level.